|
Electrical Installations
It is important that all electrical installations are to the latest standards, safe and carried out by reputable and competent contractors. All Total Battery Management electrical installations are carried out to the latest regulations and we only use our approved electrical engineers. - In the UK all work will be carried out by NICEIC approved Contractors (www.niceic.org.uk)
- All installations will be to IEE Regulations 17th Edition 2008
- Ian Brazier - Technical Director is certified to 17th edition, this ensures that all of our work meets the latest legislative requirements
- Busbar installations will be used as our preferred method of electrical installation wherever possible to give flexibility for the future
- All of our electrical installation work can be to suit your requirements. We can install complete projects from a suitable incoming mains supply or can wire individual items to existing points to suit your needs
- We can also install 110v supplies for hand tools in the charging area where needed
- We can install CAT 5 data cabling to suit battery room management systems
- We can install charger manufacturers low level switching kits where needed
|